Specifications for Electric Service
All services are subject to the requirements listed in the Rules and Regulations. For comments or questions, please contact BWP’s Electrical Division at (818) 238-3575.
- S-0458 - Barrier post detail
- S-0708 - G.O. 95 clearances
- S-0709 - Temporary overhead electrical service requirements
- S-0714 - Ladder accessibility
- S-0790 - Padmount equipment painting guidelines
- S-0821 - Bonding grounding electrode conductors and grounding electrodes specifications
- S-0827 - Temporary underground electrical service requirements
- S-0831 - Installation guide meter cabinet enclosure clearances 0-600 volts
- S-0459 - Underground service pedestal requirements
- S-0733 - Underground service pedestal in the public right of way
- S-0806 - Multi-level meter rooms
- S-0814 - Periscope service commercial 100, 200 amp panel installation without eave
- S-0815 - Periscope service commercial 100, 200 amp panel installation with eave
- S-0816 - Periscope service commercial below eaves attachment
- S-0817 - Periscope service commercial 100, 200 amp panels installation with support rack
- S-0825 - Multi-unit apartments
- S-0829 - Typical overhead service rack
- S-0330 - 6' x 8'6” three phase transformer pad
- S-0460 - 3' x 5' pullbox grounding requirements
- S-0461 - Primary riser pole grounding requirements
- S-0462 - Cable box with slab for padmounted switch cabinet
- S-0464 - Single phase padmounted transformer pad details
- S-0474 - Padmount transformer retaining wall detail
- S-0600 - Switch & transformer pad required clearances orientation plan no. 1
- S-0601 - Switch & transformer pad required clearances orientation plan no. 2
- S-0602 - Switch & transformer pad required clearances orientation plan no. 3
- S-0603 - Switch & (2) transformer pads required clearances orientation plan no. 1
- S-0604 - Switch & (2) transformer pads required clearances orientation plan no. 2
- S-0605 - Switch & (2) transformer pads required clearances orientation plan no. 3
- S-0606 - Switch & (2) transformer pads required clearances orientation plan no. 4
- S-0615 - 4’ x 6’6” x 6’ concrete pullbox (sidewalk rated) and grounding reqs.
- S-0671 - 9’ x 15’ transformer pad details
- S-0706 - Riser detail
- S-0723 - 8’ x 10’6” three phase transformer pad details
- S-0724 - Clearances requirements 6’ x 8’6” three phase transformer pad
- S-0725 - Clearance requirements 8’ x 10’6” three phase transformer pad
- S-0729 - 4’ x 6’6” x 6’ concrete pullbox (traffic rated) and grounding reqs.
- S-0730 - Detail spec for precast manhole inside dimensions 6’0” x 12’0” x 7’0” high
- S-0732 - Required clearances switch pad 7’ x 10’6”
- S-0804 - Detail spec for precast manhole inside dimensions 8’0” x 14’0” x 7’0” high
- S-0824 - Specifications for the construction of underground electrical systems including divisions of responsibility
- S-0826 - Clearances requirements 4’ x 4’6” single phase transformer pad